FYI...
Begin forwarded message:
> From: Chris Westerfeldt <cwest at tunl.duke.edu>
> Date: April 15, 2011 10:53:19 AM EDT
> To: "Randy Orange Jr." <randy.orange at duke.edu>
> Cc: John Cesaratto <cesaratt at tunl.duke.edu>, John Dunham <dunham at tunl.duke.edu
> >, Jeff Addison <addison at tunl.duke.edu>
> Subject: Re: Physics chill water
>
> Thanks Randy. Chilled water loss will not require us to shut down
> anything other than the accelerators.
> - Chris
> +++++++++++++++
> Chris Westerfeldt
> Research Scientist
> Duke University Physics Dept.
> Radiation Safety Manager
> Triangle Universities Nuclear Laboratory
> Box 90308
> Durham, NC 27708
> Tel: (919) 660-2545
> Fax: (919)660-2634
> cwest at tunl.duke.edu
>
>
>
> From: Randy Orange <randy.orange at duke.edu>
> Date: Fri, 15 Apr 2011 10:27:28 -0400
> To: Chris Westerfeldt <cwest at tunl.duke.edu>, "Tyffany Kittrell
> (tck6)" <kittrell at math.duke.edu>
> Cc: Randy Best <rb37 at phy.duke.edu>
> Subject: RE: Physics chill water
>
> We’ll do this Monday morning and it is the campus chill water.
>
> Randy
>
> From: Chris Westerfeldt [mailto:cwest at tunl.duke.edu]
> Sent: Friday, April 15, 2011 10:12 AM
> To: Randy Orange Jr.; Tyffany Kittrell (tck6)
> Cc: Randy Best
> Subject: Re: Physics chill water
>
> They say that Monday is best. Please let us know which system will
> be off so that we can shut down the appropriate equipment
> Beforehand.
> - C
>
> +++++++++++++++
> Chris Westerfeldt
> Research Scientist
> Duke University Physics Dept.
> Radiation Safety Manager
> Triangle Universities Nuclear Laboratory
> Box 90308
> Durham, NC 27708
> Tel: (919) 660-2545
> Fax: (919)660-2634
> cwest at tunl.duke.edu
>
>
>
> From: Randy Orange <randy.orange at duke.edu>
> Date: Fri, 15 Apr 2011 09:40:05 -0400
> To: "Tyffany Kittrell (tck6)" <kittrell at math.duke.edu>, Chris
> Westerfeldt <cwest at tunl.duke.edu>
> Subject: Physics chill water
>
> I will need to shut the chill water down to make a leak repair. We
> would like to schedule this next week first thing in the morning.
> This should be about a 10 – 15 min. job; but if we run into a
> problem it can be as long as 2 hrs. This will affect building
> cooling on the south (Math) end facing French. An Alert Notice will
> follow.
>
> Chris – this will affect the LENA. Equipment is on process water,
> correct? Any day better then the other? This is to repair the leak
> you found outside the building.
>
> Any questions or concerns please contact me. Thank you.
>
> Randy
-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://tunl.duke.edu/pipermail/lena/attachments/20110415/10ea9daa/attachment.html
More information about the LENA
mailing list